|
Short Summary of Building Experience
West Street Improvements Multi-Use Path
| Berkeley, California |
City of Berkeley
|
| Lead Consultant |
2003-
|
| Concept design and construction documents for an important multi-use linkage, including design of a decorative gate at one ond of the linear park and a new mid-block crossing of University Avenue. |
Guidance for Context Sensitive Design of Major Urban Thoroughfares
|
Institute of Transportation Engineers (ITE) and
the Congress for the New Urbanism (CNU)
|
| Subconsultant to Kimley-Horn and Associates |
2004-
|
| Guidelines and best practices for Context Sensitive Design. CD+A will focus on the linkages of thoroughfare design and urban design context, the pedestrian design elements of the guidance, and guidance in terms of streetscape and context. |
San Leandro East 14th Street Hesperian Boulevard Roundabout Study
| San Leandro, Calfiornia |
City of San Leandro
|
| Lead Consultant |
2003
|
| Conceptual design for a roundabout including analysis of urban design and transportation impacts as compared to an earlier plan with multiple intersections. The project coincides with the southern boundary of the East 14th Street South Area Development Strategy. |
Master Schematic Design Plan for El Camino Real
| Palo Alto, Calfiornia |
City of Palo Alto
|
| Lead Consultant |
2002-
|
| Explores how functional and aesthetic improvements can be made to El Camino Real in order to achieve a better balance between the needs of the automobile, bicycles, pedestrians, and transit, while reinforcing and reflecting its importance as a "main street" within Palo Alto |
San Pablo Avenue Streetscape Plan and Design Guidelines
| Berkeley, California |
City of Berkeley
|
| Lead Consultant |
2001-2003
|
| CD+A developed prototypical schematic designs and specifications that illustrate solutions to specific conditions, such as bicycle and pedestrian crossings, handicapped ramps, corner bulb-outs, new medians, gateways, public art, and street tree and other landscape improvements for existing medians and sidewalks along this urban arterial in Berkeley, California. |
Green Streets: Environmental Designs for Transportation
| Metro Portland Region, Oregon |
Metro Regional Services
|
| Lead Consultant |
2001 - 2002
|
| CD+A led a multi-disciplinary team in developing a Green Streets Best Management Practices (BMP) Handbook for the Portland Metro Region, addressing the water quality implications of overlaying a well-connected street pattern onto an existing stream system within the Regions urban land reserve. |
Laurel District MacArthur Boulevard Conceptual Design
| Laurel District |
City of Oakland, CA
|
| Lead Consultant |
1999
|
| Streetscape design for major arterial street in Oakland, California featuring traffic calming devices, attractive landscaping, and bulb-outs at intersections for improved pedestrian crossing and as locations for amenities such as outdoor seating and bicycle racks |
West Berkeley Rail Stop & Transit Plaza Improvements
| Berkeley, California |
Berkeley Redevelopment Agency
|
| Lead Consultant |
1999-
|
| Conceptual design and construction documents for improvements to City's Amtrak station, including a new glass and steel canopy, signage, and transit loading areas. |
West Berkeley Redevelopment Area Capital Improvements
| Berkeley, California |
Berkeley Redevelopment Agency
|
| Lead Consultant |
1999-
|
| Conceptual design for improvements to City's Amtrak station, new gateway connection to City park, and streetscape improvements throughout redevelopment area in an effort to prioritize public investments. |
|
|
|